Distribution Main Warton Road

This project involved the construction of a DN400 mm and DN 500-mm "Sintacoat" steel distribution main along Warton Road and Ranford Rd, Canning Vale.

The distribution main, passing under Warton Rd and 2 side streets was installed by trenchless methods. The road crossing (20 m x DN400, 80 m x DN400 and 50m x DN500) were installed using a directional drill to bore a pilot hole and the steel pipe was pulled back while reaming out the borehole.

This operation was carried out under normal traffic conditions without any disruption.