The scope of this project was to horizontal drill new ducts and pipes for relocation of existing services, construction of two manholes over new and existing communications ducting. Works carried out as part of the New Metro Rail project consisted off. Directional Drilling of 10 x DN160 11KV ducts 5M under rail lines for power, 55M Directional Drilling of 3 x DN400 ducts for carrier pipe for new Telstra & Optus ducting, 55M Directional Drilling of 7 x DN355 ducts for 132kv underground power cables, 100M Construct 2 cutover manholes to pick up new and existing Telstra and Optus cables, 20m2 each Directional Drilling of 1 x DN225 PE gas sleeve for High Pressure, 85M. The project had many challenging components such as;
The entire project was a success with the project being completed on time and to our customer’s satisfaction.